Case Study No.1
200 Megalitres of Copper contaminated water treated for environmental protection and release.
Case Study No. 1 .pdf file |
Case Study No.2
685 megalitre Abandoned mine treated for Environmental protection with 140 tonnes of reagent in 11 days.
Case Study No. 2 .pdf file |
Case Study No.3
Mount Morgan Mine Emergency wetseason treatment using 520 tonnes of reagent in 65 days.
Case Study No.3 .pdf file |
Case Study No.4
Treatment of 360 Megalitre pit containing High Acidity, Dissolved Metals and Ferrous iron.
Case Study No. 4 .pdf file |
Case Study No.5
Abandoned mine leachate treated for Xstrata.
Case Study No. 5 .pdf file |
Case Study No.6
9 Pits (540 Megalitres) treated in 14 days with 85 tonne of reagent.
Case Study No. 6 .pdf file |
Case Study No.7
Environmentally sensitive waterways treated for suspended solids.
Case Study No. 7 .pdf file |
Case Study No.8
Blue Green Algae Treated for Toxins and Suspended Solids to allow irrigation disposal.
Case Study No. 8 .pdf file
|
Case Study No.9
Contaminated pits containing 355 million litres treated in 5 days with 61 tonne of reagent.
Case Study No. 9 .pdf file |
Case Study No.10
60 megalitre contaminated quarry pit treated with automatic pH correlator for Gold Coast City Council.
Case Study No. 10 .pdf file |
Case Study No.11
CRAB used by Department of Natural Resources & Mines to treat leachate from 800 hectares of highly acidic disturbed Acid Sulphate Soils.
Case Study No. 11 .pdf file |
Case Study No.12
44 Tonnes of Gypsum applied to a 16Ha Coal Seam Gas holding dam to treat high suspended Solids.
Case Study No. 12 .pdf file |
Case Study No.13
785 Megalitre Sand Mine remediation completed in 6 days
Case Study No. 13 .pdf file |
Case Study No.14
5.4 Hectares of highly acidic waste rock neutralised to prevent further AMD runnoff.
.pdf not available
|
Case Study No.15
Contaminated Holding dam treated for irrigation disposal.
Case Study No. 15 .pdf file |
Case Study No.16
55 megalitre contaminated Quarry site treated for licensed environmental release.
.pdf not available |
Case Study No.17
Contaminated water in rail Line construction site treated to allow continuation of works.
.pdf not available |
Case Study No.18
Coal Stockpile runnoff holding dams treated for low pH and Disspolved metals prior to reuse.
.pdf not available |
Case Study No.19
RO treated Coal Seam Gas water treated to modify SAR ratio to allow irrigation disposal.
.pdf not available |
Case Study No.20
Highly acidic metal contaminated dam treated for the Local Council.
.pdf not available |
Case Study No.21
850 Megalitre Suspended Solids contaminated Community lake treated in 2 days.
.pdf not available |
Case Study No.22
Gas pipeline Pressure Test Pit treated for contaminants before Irrigation disposal.
.pdf not available |
Case Study No.23
Treatment of Environmentally sensitive contamination caused from Construction site.
.pdf not available
|
Case Study No.24
Bathymetric survey of council leachate holding pit.
.pdf not available |
Case Study No.25
In-Line bulk water treatment water quality (2004)
Case Study No. 25 .pdf file |